Assignment #2B
Acme PharmaceuticalsApache Facility Expansion (Part B)
Cost and Vendor Information (Applicable Through Dec. 2000)
Note: If printing this page, consider switching printer orientation to "landscape" mode (i.e., 11 x 8½)
Apache Facility Expansion Task Time Vendor Cost ------------------------------------------------------------------------------------------ Design automated system 15 days Automated Systems $ 20,000.00 Prep specs for robotic equipt 15 days Automated Systems (included) Architectural finishes 15 days Brown Construction $ 55,000.00 Construct Bldg Exterior & Structure 18 days Brown Construction $350,000.00 Construct Bldg Foundations 25 days Brown Construction $145,000.00 Construct loading dock 15 days Brown Construction $ 75,000.00 Install Plumbing, Elect, & HVAC 15 days Brown Construction $175,000.00 Design conveyor system 20 days Conveyors Inc. $ 15,000.00 Prep specs for conveyor system 10 days Conveyors Inc. (included) Fabricate & deliver MCC 88 days Formica Ltd. $ 45,000.00 Install MCC 20 days Formica Ltd. $ 56,500.00 Fabricate & deliver robotic equipment 60 days GE Systems $305,000.00 Install robots 15 days GE Systems $ 32,000.00 Connect equipment 10 days LCI Inc. $ 25,000.00 Install u-processor 3 days LCI Inc. $ 65,000.00 Operator training 10 days LCI Inc.,Acme $ 15,000.00 Test & start-up 5 days LCI Inc.,Acme $ 7,500.00 Obtain u-proc vendor data 15 days Micro Engineers $ 25,000.00 Write pgrms for u-processor 25 days Micro Engineers $ 12,500.00 Write program documentation 15 days Micro Engineers $ 17,000.00 Bid & award Conveyor system 15 days Price Architects (included) Bid & award MCC 15 days Price Architects (included) Bid & award Robot subcontract 15 days Price Architects (included) Bid and award construction contract 15 days Price Architects (included) Design building 25 days Price Architects (included) Design plant layout 10 days Price Architects (included) Prep specs MCC 15 days Price Architects (included) Prepare (building) engr dwgs 20 days Price Architects $ 75,000.00 Install loading dock gravity roller conveyors 5 days Trimble Co. $ 17,500.00 Fabricate & deliver conveyor 90 days Wright Inc. $165,000.00 Install interior belt conveyors 15 days Wright Inc. $ 25,000.00 |
Copyright © 2001-2005 by Bill Hemphill. All Rights Reserved. | ||
Updated June 5, 2005 |